![]() | |||
![]() |
This inspection consists of a report with photographs documenting a building or property prior to any building works commencing on an adjoining building or property. The first inspection documents any existing cracking or damage before any work commences. When the building works are complete a final inspection is then carried out. If there are any changes these are then documented so relevant remedial works can be carried out. | ![]() | |
![]() | ![]() | ||
![]() | |||




Substandard floor framing above. Inadequate ground clearance & floor frame support far right. Uncapped live wires on ground, loose water pipes, untreated timber framing in direct contact with the ground bottom far right.

